
Steps in the process
September, 2014
Day before the move
Remove from Sakura Square
Arrival to destination
|
|
|
|
|
| Dedication plaque | Before view 1 | Before view 2 | Before view 3 | Before view 4, notice the debris |
|
|
|||
| Plaque for 2001-2002 restoration - Takayama names | Plaque for 2001-2002 restoration - Denver names |
|
|
|
|
|
| Front | Front top | See where the pieces go | See where the pieces go | |
|
|
|
|
|
| Close up of details | Close up of details | Close up of details | Close up of details | Close up of details |
|
|
|
|
|
| Tarp protection overnight | Tarp cleared off | Tom's makeshift ramp helps out | Rolling to work area | Rolling to work area |
|
|
|
The top rests on four poles that go down to the center of the base. | To remove it, one person gets into the base and two or more others lift from the outside. |
| Tight clearance | Out from under the roof | Take railing off | Remove top of yatai | Remove top of yatai |
|
|
|
|
|
| Tom guides the top | Rob and Chris lift | Remove top of yatai | Forklift lifts pallet to give top a ride down | Forklift helps get the top out and down |
|
|
|
|
|
| Load the top into the first truck | Protect the roof | Grab the railings | Load the railings into the truck | Don't forget the wheels |
|
We thought we'd load the second truck at the loading dock area, so we had to move the yatai there ... |
|
|
|
| First truck ready to roll | Strategy | First, plastic wrap the base | Just to be safe | Now roll it to the loading dock |
|
But the yatai can't get past a post, so back we go... |
|
|
At this point we realize the forklift will not be enough |
| Truck at loading dock | Realization | Back to the original spot | Get the base back to the second truck | Reality again |
| We find out we need to use the forklift and the truck's power tailgate together to lift the base |
|
|
|
|
| Get the base on to the second truck | Alternate lifting by each | Plus some physical labor | Success! | Gone yatai |
|
|
|
So now we caravan to the Asahi Food warehouse | |
| Stacey and Gary stopped by | Jesus, Yvonne, Martin | Micheal waits for dad | Off to deliver the yatai |
|
|
|
|
|
| Destination location | Unload the the base first | Ummm - now what? | Give me a hand | Where do you want it? |
|
|
|
|
|
| Here? | Ah, no, here. | Unload the second truck | Re-attach the wheels | Unload the top section |
|
|
|
|
|
| Unload the roof | Put it down in the warehouse | Set on to a pallet | Charlene wipes off dust | Charlene wipes off dust |
|
|
|
Meanwhile the top section is being positioned for lifting back in to place ... |
|
| Charlene wipes off dust | Restore a phoenix | Restore 2nd phoenix | At the same time ... | Take top over to base |
|
|
|
|
|
| Take top over to base | Here we are | Pass it on up, guys | Lift top | Line it up |
|
|
|
|
|
| Forklift roof to yatai | Forklift roof to yatai | Forklift roof to yatai | Attach roof to yatai | Line it up |
|
|
|
|
|
| Pass the railings up | Re-attach the railings | Put back the yokes | Save extra decorations | We're all done! |
Steve, Charlene, and Tom thank all the workers and especially Marie Verrett for her photography
Email us if you would like additional
information.
Or call us at: 303-355-2752
We would love to see your comments
and recommendations for our site.
Our privacy policy: we do not leave cookies on your site; we do not track your visits; we do not disseminate any information about you because we do not gather any information about you.